Hi all,
I've been playing in Ultrascene, mostly as a different way of doing double boxes (2-Ups as some call them) even though I have plenty of switcher space. But it's a fun feature. Except ...
I have 3 scenes, UltraScene 1, 2 and 3 and two panel inputs, Scene 1 and 2. US 1 and 2 are stored in Scene 1. US 3 is stored in Scene 2. When I call up any of the two stored in Scene 1, Scene 2 goes black. When I call up what is stored in Scene 2, it also recalls what is stored in US2, which is Scene 1.
I've gone through the manual and the instructions are pretty basic.
Signed,
Confused in San Francisco.
------------------------------
[Danny] [Skarka] Ross Pilot since Synergy
[Producer, Director, Technical Director]
San Francisco United States
------------------------------