I'm new to Xpression so not versed in the intricacies of it yet.
Each roll is a different length as we want the speed the same in all of them. The total package is about 80 minutes. I'm getting tired of mixing it manually about every other week.
I want the last 15 sec. of video with address info paused on screen. I was thinking a VBA script that would start a 15 sec. countdown timer on an event marker that stops the roll at the end of each scene group and then start the next roll when the timer ends. Not sure where to begin though.
#XPression