I want to get some feedback on implementing a couple of squeezebacks. I'm working with a Carbonite and have the squeezeback built on ME 1 and ME 2 is my P/P.
- Perform CC 1 which sets two sources of keyers in ME 1
- Set BG of ME 2 to the highest keyer from ME 1 (DSK 2 in this case)
- Take ME 1 on ME 2 BG so we are linked to the same source on both MEs.
- Perform CC 2 to squeeze back
- Grow Right or Left Full on ME 1
- Take same source as ME 1 BG, on ME 2 BG to link back to ME 2 on PP.
Is this the best way to do this? It seems like I am limited by ME follows because I cannot set ME 1 DSK 1 source, to ME 2 BG, which would solve all my issues since it would follow the source I needed.
------------------------------
Chris Fore
Dallas United States
------------------------------