Some detail about how you are putting the videos into Sequencer would help, especially how the clip drop template is made, or if you're dropping directly into Seq.
But things you could take a look at:
- Does your active project match the framerate of the clips?
- are you using a placeholder video material in the scene director?
- Depending on template design (video placeholder), enable "Adjust Scene Director Length to Match Clip Length" (Material > Video Shader > Run Mode)
Original Message:
Sent: 10-12-2023 11:49
From: Michael Wagenknecht
Subject: Uploading Videos to XPression
They are videos. We can bring them in as MPEGS or AVI.
------------------------------
Michael Wagenknecht
Video Production Coordinator
Mane Media
Original Message:
Sent: 10-12-2023 11:48
From: Simon Redmile
Subject: Uploading Videos to XPression
What are the spots? videos?
------------------------------
Simon Redmile
Senior Graphic Programmer & Designer
Ross Video
Bristol United Kingdom
Original Message:
Sent: 10-12-2023 11:45
From: Michael Wagenknecht
Subject: Uploading Videos to XPression
We are trying to bring in commercial spots to XPression but we seem to have an issue adjusting the duration on the Sequencer. For example, we have a 1 minute spot but when we upload it to the sequencer it shows it as a 30 second duration. We have seen that we can adjust the speed of the clip but that seems to alter the video quality and then we have to determine our countdown based on half speed. I know this is hard to explain without visuals but I hope this is understandable.
------------------------------
Michael Wagenknecht
Video Production Coordinator
Mane Media
------------------------------