Profile

Joey Shelby

Contact Details

My Content

1 to 4 of 4 total
Posted By Joey Shelby 06-02-2025 11:20
Found In Egroup: Production Switchers
\ view thread
I was given a Crossover 12, and frame, it did not have the power supplies for it, does anyone have a pinout etc for them? ------------------------------ Joey Shelby Technical Director WAKA Television Montgomery United States ------------------------------
Posted By Joey Shelby 08-22-2023 17:41
Found In Egroup: Production Switchers
\ view thread
Hello everyone! I recently was allowed to take home a Ross Vsion 2 me switcher, when attempting to boot it up, I'm getting a "file system error" and it's asking for a root password, does anyone know this password by chance? also how would I got about replacing the hard drive and get Operating system ...
Posted By Joey Shelby 04-17-2018 16:42
Found In Egroup: Production Switchers
\ view thread
is it an HD one?
Posted By Joey Shelby 06-28-2016 15:11
Found In Egroup: Production Switchers
\ view thread
can anyone tell me at what point the Vision's frame will shutdown, due to overheating,or at least kick the cooling fans in at a higher speed, the reason is we had an Air Conditioner trip on us this morning so the server room was hot,after getting air working,it took a long time to get the room cool ...