Profile

Andrew Grieves

Contact Details

My Content

1 to 7 of 7 total
Posted By Andrew Grieves 10-15-2025 13:37
Found In Egroup: Production Switchers
\ view thread
thank you. ------------------------------ Andrew Grieves Technical studio director create and craft ------------------------------
Posted By Andrew Grieves 10-15-2025 11:01
Found In Egroup: Production Switchers
\ view thread
the image is larger than the raster screen. so guessing thats out of the question too then. so only smaller can be repositioned? ------------------------------ Andrew Grieves Technical studio director create and craft ------------------------------
Posted By Andrew Grieves 10-15-2025 10:28
Found In Egroup: Production Switchers
\ view thread
hello, so i have an image that is larger that 16/9 but trying to use the XY-position, so i can still use the center of the image but the values will not change. not sure why i can't change these, its clearly a setting that can be changed surely? ------------------------------ Andrew Grieves Technical ...
Posted By Andrew Grieves 02-15-2022 06:49
Found In Egroup: Production Switchers
\ view thread
thank you this worked out in the end just need to tweak timings, is there a away to change transition speeds of the cc recall the ME recalls are set up t have a 60 speed for recall diss but cant find anything for it in CC was hoping it would use the timings from the MEs but doesn't seem to. ----- ...
Posted By Andrew Grieves 02-14-2022 08:16
Found In Egroup: Production Switchers
\ view thread
thank you Les O'Reilly I will be giving it ago tonight when off air to make the changes Andrew Technical studio Director - Create and Craft ------------------------------ Andrew Grieves Technical studio director create and craft ------------------------------
Posted By Andrew Grieves 02-10-2022 12:34
Found In Egroup: Production Switchers
\ view thread
depending on what desk you have but what we do for that is use your ME 1 not the P/P ME. so use the ME1 to build your 4 DVE keys in the config that you want and use your P/P ME to drive the graphics over lay. your ME 1 will be able to run this and not the Minis 1 to 4 as they can only use 2 keys ...
Posted By Andrew Grieves 02-10-2022 11:50
Found In Egroup: Production Switchers
\ view thread
This is for the Carbonite ultra so the idea was just for fun and to see how far can i push the switcher. what I'm trying to do is use all my Mini MEs as my DVE sources for 8 feeds that are all off screen with a green screen back ground in each of the Mini MEs program feed, and use CC to control ...