Profile

Joe Campbell

Contact Details

My Content

1 to 4 of 4 total
Posted By Joe Campbell 05-22-2025 11:55
Found In Egroup: Production Switchers
\ view thread
Hi Les, this is more of a hypothetical as we are integrating a multistudio facility and I'm trying to ease the client's mind. I haven't experienced a full freeze where I haven't been able to use Dashboard to reboot the blade, but they've had some trouble with their current Carbonite Ultras freezing. ...
Posted By Joe Campbell 05-22-2025 10:17
Found In Egroup: Production Switchers
\ view thread
Thanks for the reply Paul. I'm really curious if there's a way to reboot when the SDPE becomes completely unresponsive to Dashboard and the control surface/menu interface. Like an emergency, "hit this button to stop and restart all processes on individual SDPE blade" so if I have live shows going ...
Posted By Joe Campbell 05-21-2025 20:47
Found In Egroup: Production Switchers
\ view thread
In the event of an Ultrix Carbonite SDPE blade crash/freez, is there a way to reboot a single SDPE without needing to reboot the whole router? If we have 4 SDPEs in an FR12, we don't want to shut down the other 3 studios just to get one back up and running. ------------------------------ Joe Campbell ...
Posted By Joe Campbell 05-15-2025 11:49
Found In Egroup: Production Switchers
\ view thread
I was recently engineering a show where we had both IMAG and Program cut needing tally. The IMAG feed was fed to a Spyder, where the op would switch between content and the IMAG cut. The camera operators were complaining that it was confusing to have Red tally when they weren't on program, but were punched ...